Construction Testimonials

A Campus-wide Central Cooling System: A case study in upgrading facilities for the twenty-first century
The Technical Research Campus of Rhône-Poulenc Corporation occupies 85 acres with 14 buildings housing over 700 employees. An aging infrastructure presented a number of problems, including high maintenance, high energy consumption and insufficient capacity. The client wanted to return to a central plant structure with capacity for future growth. (296 kb)


A Research Center: A case study in laboratory modernization
The Technical Research Center of a large chemical group contains 21 laboratories. Energy consumption was high; existing systems were deteriorating. Additionally, the owner wanted to assure complete compliance with OSHA laboratory safety regulations. (260 kb)


Gallium Alley: A case study in the art of high-speed, high technology design/build
A high-technology company was expanding its capabilities to produce computer chips. In order to honor extremely time sensitive contracts, Monsen produced a cleanroom facility, up and running, in five months. (128 kb)


J. R. Tobacco: Producing comfort in a smoke-filled room
A renowned cigar retailer transformed a 6,000 sq. ft. building into a wine bar, retail gift shop and cigar museum. The challenges were: (1) To keep people comfortable and cigars fresh (2) To maintain proper indoor air quality by efficiently removing cigar smoke and (3) To make indoor air conditioning systems aesthetically pleasing. (92 kb)


President's Hall: A case study in aesthetic preservation of a college building
The administration wished to improve overall air quality as well as uncomfortable working conditions. The challenge was to make these improvements without sacrificing historic aesthetics. (68 kb)





Top | Home | Company | News | Industry Information
Testimonials | Careers | Contact | Site Map

©2004 Monsen All Rights Reserved