Two Semi-Conductor Clean Rooms
As a manufacturer of film for semi-
conductors, our client needed to maintain
a carefully balanced environment to
create a flawless product. In need of a
clean room for their New Jersey facility,
the Korean-based company called on
Monsen Engineering to design and install
a class 10,000 film slitting clean room and
a class 100,000 packaging room within
their existing warehouse.
C
HALLENGE
The project posed two challenges. The
first was to design a “room within a
room," which required working within the
confines of the existing building to create
a seamless expansion. The second was to
meet a six-month deadline that included
outfitting the entire project with
peripheral equipment to support the
installation of manufacturing equipment
from Korea.
S
OLUTION
Throughout the design phase, our
engineers worked closely with our client’s
engineering team to guarantee an efficient
manufacturing process.
The project required that our team select
and procure peripheral equipment such
as: pneumatic system, air shower,
automatic shutter doors, storage racking,
automatic pallet wrapping machine,
electric fork lift, and monorail hoist
system. In addition, our team was
responsible for rigging and assembling
the equipment shipped from Korea.
Upon completion, Monsen brought in
independent commissioning experts to
confirm that each room was operating
as expected. Our client’s marketing
group then used the commissioning
report to demonstrate the superior
quality of the environment in which they
produce their products.
R
ESULTS
Monsen’s effective design/build process
kept the project on time and within
budget. To ensure a successful outcome,
we performed commissioning throughout
all phases of the project. Most important,
Monsen’s single-source strategy
exceeded our client’s expectations for a
sophisticated manufacturing facility
where they have secured substantial
orders for their product from Fortune 100
companies.
For more information on this case study
or topic, call Dean Bustamante at
973-227-1880 x135.
9
Service
9
Engineering
9
Construction
9
Automation
9
Design/Build
9
Energy Services
9
Mechanical Engineering
9
Plumbing
• Four-time winner of Contracting
Business' Design/Build Award
• Licensed Engineers
• LEED Certified Engineers
• NATE Certified Technicians
• Authorized Andover Controls Dealer
www.monsen.com
Full-Service Capability
Rock Solid Experience
Friends of Monsen
5
years
6
J
OIN
O
UR
C
IRCLE
OF
F
RIENDS
Monsen wants to hear from you! We invite you
to send a short success story, challenge, or
tough question to Dean Bustamante at
dbustamante@monsen.com. Your company
may be featured in our next newsletter!
New!
N
EW
L
OOK
We've changed our
quarterly newsletter
to better meet your
needs. You will now
receive Monsen News in an easy-to-read,
two-page format. We welcome your comments
and any new subscribers. Please write to
dbustamante@monsen.com.
© 2004 Monsen Engineering Company
Debra Hamilton, president of Creative
Communications & Training, recently accepted
Monsen Engineering's Quality Vendor Award
for helping us create clear and targeted
communications.
Debra has been Monsen's communications
consultant for over six years. She has helped
us produce marketing materials such as fact
sheets, case studies, and published articles.
She has also helped Monsen write extensive
project summaries that resulted in Monsen
winning two prestigious Design/Build Awards
from Contracting Business Magazine.
According to Eric Monsen, "Debra's invaluable
service enables us to educate our customers
and earn new clients. Her partnership with our
company has resulted in Monsen achieving
many of its goals."
pg_0002
Cold weather is approaching!
Here’s how to get your heating
system ready before the cold
temperatures arrive:
1. Change the equipment filters.
2. Thoroughly vacuum the duct
system to remove dust,
bacteria, and allergens.
3. Clean the coils. Dirty coils
hinder the unit’s ability to warm
the air moving through it.
4. Have the ducts inspected for
leaks. Gaps and cracks
account for a 25% to 40% loss
in heating efficiency.
5. Have the system checked for
carbon monoxide emissions.
Install a carbon monoxide
alarm.
6. Install digital thermostats.
Set the thermostat's timer to
automatically lower at night
and maintain a consistent
temperature during the day.
Source:
www.theomahachannel.com
Rules of Thumb
Is your heating unit ready
for winter.
Calibration is more than just verifying
the accurate operation of your
electronic equipment. In highly
regulated industries such as yours,
instrument calibration is a mandatory
process that must take place at specific
times—usually every six months or
sooner. And whether
you have to meet ISO
9000, FDA Part 11, or
QS 9000 equipment
calibration standards,
your company must
document its
compliance.
M
ONSEN
I
S
R
EADY
TO
H
ELP
Monsen Engineering is equipped and
staffed to carry out different levels of
calibration for all types of instrumen-
tation. Our ISA-certified technicians are
trained on documentation, SOPs, GMP,
and OSHA safety standards.
Our technicians will make sure that your
equipment is accurate, precise, and
compliant with the regulations set for
your manufacturing environment.
O
UR
S
ERVICES
P
UT
Y
OU
IN
C
ONTROL
As key players in this field, we help you
achieve total control of your equipment
information. As your calibration expert,
Monsen does more than make sure your
Monsen Engineering Company
6 Daniel Road
Fairfield, NJ 07004
Tel: 973-227-1880
Fax: 973-227-7641
www.monsen.com
Calibration—
Your key to control and compliance
equipment meets regulatory standards.
We also:
• automatically schedule calibrations;
• track standards and preventative
maintenance needs;
• designate calibration procedures; and
• produce equipment
data history
and reports.
C
OMPLIANT
S
YSTEMS
S
AV E
Y
OU
M
ONEY
Monsen's technicians
can group instruments together for joint
calibration, a significant step that saves
time and money. In addition, we store
the testing methods in a database and
download them directly into a self-
documenting calibrator.
With Monsen, you can count on ISA-
certified technicians, NIST calibrated
instruments, efficient documentation,
and fast turnaround. Most important,
our cutting edge software and calibration
solutions help you achieve compliant
systems and pass your annual FDA and
ISO audits.
For more information on calibration and
related topics, call Dean Bustamante at
973-227-1880 x135.
Our ISA-certified
technicians ensure that
your equipment is accurate,
precise, and compliant.